Answer Posted / seetha
Allocation of human control functions to the technical equipments with the programming condition is known as industrial automation.
Is This Answer Correct ? | 13 Yes | 3 No |
Post New Answer View All Answers
why u r living from presentaly working.
what is the correct method for the outdoor termination of 19/33 KV HT cable step by step?
Dg pf .71 i am improve pf 0.80 what capacitor connected in dg how?
explain the functions of main isolation switches
What is the effect on power factor, shown by a trivector meter; incase of reverse phase sequence. If the power factor of a system is lag what meter will show in case of reverse phase sequence connected to the meter. and What in case of lead.
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
How do I calculate/select Droop CT ratio for various capacity of generators?
what is PID control in VFD drives?
What is the simplest formula to calculate the rotor diameter of a synchronous generator?
how to modify DOL control panel into Delta Y connection?
how works inductive &capacitive sensors?
Do Phase angle measurement have any application in freq/harmonics measurement? If so how?
What are steps to be taken while designing of DYN11 distribution transformer to achieve magnetising balance?
Dear sir, I completed DECE In the year 1995.Now i am working in a private company from last 10 years as an Electrical supervisor.The company having a 1000 KVA transformer.Now i try to apply "C" Licence. I am eligible or not.If not eligible,pls give solution.
Why need 3phase machine double earthing?