Answer Posted / satya pal
order in which cables are pulled n psc girder shall be explained.after casting of girder,after how many days and in which order cable shall be pulled.
regards
satya pal
| Is This Answer Correct ? | 11 Yes | 12 No |
Post New Answer View All Answers
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
Explain the latest method to detect a crack in a building?
What is the name of this multiplication factors ?
What is made from large rocks, which protects the base of cliffs?
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
In reclamation works what are the importance of geotextiles and sand?
For fine aggregate which is most suitable River sand or crusher sand & why ?
Trapezoidal section footing calculation of Volume & its Area
what is the name of shuttering oil used in oman
What are the disadvantages while using stone dust as filler in pavements?
Define the various stages of the project planning process in construction.
what is the difference between tsp & tower