Answer Posted / tejas mehata
the branch engg that deals with the technology especially
for design the circuit and operating equipment from the
control room in the corporate world.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
300m long and 30kw inductive loade 3phase supply how many size cable required
The electrical energy required to raise the tempreture of a given amount water is 200 kwh. If the heat losses are 20%, the energy required is?
1.what is mean by 8/20 micro sec waveshape
how to find 5 kilo meter long under ground 33 kv cable fault location if IR VALUE shows 0.05 M ohm @5000 volt.and cable fault locator shows some time fault distance 3 kilo meter ,3.7 kilo meter and some time 1 kilo meter? now how to find the fault location that where is leakage. note--it is tested with 5000 kv megger and insulation resistance is 0.05 M ohm. and some time 0.03 M ohm comes.
The specific heats of the gas at constant pressure and constant volume are respectively 1.0 kJ/kg K and 0.72 kJ/kg K; the value of R for the gas is
What is time response of the control system?
Can any body tell me the different types of LT cables & their application.
tell me some type of questions throught which i can prepare for exam and do my best
which pump used in WTP explain the function of VFD how to dtermine capacitorbank of capacity one plant
what is proper capacitor placement? How to evaluate capacitor size?
sir my exam is on 19/6/2013 under electrical branch pls send me sample aptitude questions as well as sample technical questions for jindal steel and power company
WHAT IS START TO INDUCTION MOTER IN STAR TO DELTA OF >5HP ?
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
XYZ
How many methods use the load flow solution?