Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Explain your project management?

Answer Posted / senthil kumar

project management is the joint responsibilty of 5 key personnel in a team.it includes 1 project manager,two exp engineers,1 quantity surveyars,i quality control.

Is This Answer Correct ?    19 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?

2047


What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?

2675


57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11

9577


what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete

4431


how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???

1967


Why you are leaving present job?

2174


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2499


What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?

2240


How do you compute the volume of airflow?

1174


How do you compute volume of airflow?

1345


How to calculate the force on a column of three story building. What should be the base concrete height?.

2302


 What is difference between limit state and working stress method? How it is applies in building structure.

2371


How to get MEP technical,instaaltion & testing data for interview?

2258


How did street originate in the plumbing term street ell?

1066


where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.

3488