WHAT IS MEANT BY EMBEDED SYSTEM?CAN WE CALL PLC AS EMBEDED
SYSTEM?
Answer Posted / pete poitra
No.
Embedded systems are intrisic to device or stand alone
control. However, as with cell phones, they become
networked but do not have influence on the operation of the
aggregate.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is meant by reset level of the relay?
Please tell me in DETAIL about the following 3 types of fuses or recommend me a good power system protection book or a website link ? 1.Dropout Fuse 2.Striker Fuse 3.Empulsive fuse (not sure if its impulsive or explosion fuse , sorry)
What are the basic properties of signal flow graph?
FOR 16/20 MVA 132/33 KV ONAN/ONAF TYPE TRANSFORMER IT IS DESIGNED FOR 16 MVA WITH ONAN CONDITION.IT BECOMES 20 MVA UNDER ONAF CONDITION.LOAD LOSS IS GUARANTEED FOR 65KW AT 20 MVA AND % IMPEDANCE 13.75. PLEASE TELL US AT WHAT LOAD LOSS AND % IMPEDANCE IT SHOULD BE DESIGNED FOR 16 MVA AND WHAT WILL BE ITS EFFICIENCY AT 20 MVA?
How to calculate phase to phase difference ?
sir plz send some previous year questions of jspl.
what happen if the parallel generator phase angle shift by 1 degree in manual mode
What is cathode ray oscilloscope (cro)?
Do u know any one? how to find out in motor rated amps? formula?
We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.
Why the field rheostat is adjusted such that the voltmeter reads 380V
What is the role of Dedicated earthing in UPS System?
What is Surge Capacitor? Why it is require in Generator Circuit Breaker,inspite of surge arrester?
What is the difference in calculating size of AC cables compared to calculating size of DC Cables? Usually DC Cables are larger than AC Cables although they have the same ampacity. Why is it?
What will be the fault current of any system when its generation is 10% of BASE generation( FUll Load )?Will is 10% or the same as full base calculation?