how to calculate quantity of steel & concrete in stair case
Answer Posted / saurabh kumar
first,we calculate length of waist by using pythagores rule
and this length multiply by width of waist and multiply by
thickness of waist slab.now for landing,length of landing
multiply by width of landing and multyply by thickness .we
add quantity of waist & landing which will be total
quantity of stair case
| Is This Answer Correct ? | 21 Yes | 8 No |
Post New Answer View All Answers
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
residential projects,structural.
What is the diff between cad & cadd?
List out the potential risk factors for workers on the construction site?
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
In cement concrete how to check a quality of material also proportion of material at site ?
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
what are the five benefits of using standard terminology in the measurement process?
define the strength
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
Please tell me vasthu room sizes. Thanks.