what is M & 20 of M20 concrete
Answer Posted / reddy
m is mix ic design & 20 is charectoristrength
| Is This Answer Correct ? | 2 Yes | 5 No |
Post New Answer View All Answers
What expenses counted in contingencies and how much it is in related to built-up area of the building.
it is a corrected question." make a list of engineering property(properties) of soil.
how to calibrate the RM 800
What is specific gravity???
How can you distinguish between sorption, absorption and adsorption?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
What is Gsb tollens ?
how to preaper for interview wat they asked in interview give me idea
What is the difference between built area and super built up area?
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
what is the relation between pitch of steel and depth of slab?
What is oneside mat. And explain
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
How are freeway bridges built?
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing