How to calculate concrete,s cement, sand, metal on the
bases of its ratio. For any volume of work please give me
brief calculation
Answer Posted / sourabh
1:2:4=7
1 cu m
cement=1*1*28.8/7 = 4.11 bags
coresand=1*2/7= 0.28 cu m
agreegates=1*4/7= 0.57 cu m
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
List out some of the common problems that architect have to tackle it?
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
what is the construction cost for per cft of multistorryed building in kolkata?
What is the average density of soil?
Explain the advantages and disadvantages of using plastic and timber fenders?
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
What are the different softwares used for cad?
What is the cost difference between site mix and ready mix concrete per cubic meter
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
How to calculate volume of concrete & steel on tank foundation & ring wall ?
how calculate the bearing from two coordinates?
How to activate isometric axes in cad?
Explain what is Critical Path Method (C.P.M)?
detailed calculation of the amount of cement used?