Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many cubic ft. for 50 kg ( 1 bag ) cement?

Answer Posted / gabriel

unit weight of concrete = 1440kg/cubic meter
therefore unit weight is equal to weight over volume
given the unit weight already;
1440kg/cu.m = W/V
given also the weight of cement which is 50kg
so. cross multiply and we get
v= W/unit weight = 50/1440
and the answer is = 0.0347222 cu.m.

Is This Answer Correct ?    57 Yes 20 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

TELL ME THE EQUATION FOR OGEE SPILLWAY

2577


Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.

1951


What are the steps involved in the concreting process?

1335


Which IS Code/American Code applied for coupler test of steel

2612


Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever

2233


Difference between pre-tensioning and post-tensioning.

1153


what is the clear cover for shearwall?

1592


The concrete slump recommended for beams and slabs; is?

1247


What is difference between combin footing & rapt footing

1890


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

2219


how to create our resume?

2149


What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)

2097


what is called the inverd level of mabhole chamber?

2107


What is different between DI Pipe and CI pipe?

2129


How much cement will require for 1Rmt Skirting laying

2284