what is minimum reinforcement required for rcc works
Answer Posted / madhu kumar
The minimum reinforcement for rcc column work is 0.8%
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
What is portland cement
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
Define What materials were used to build the Golden Gate Bridge?
What is the primary difference between adsorption and absorption?
What do we mean by partial moment release ??
hi guys what happens if you are absent for a supplymentry exam?
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
how to disign cuplock shuttering and it's matireal requirement snd any related web site
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
why top layer of block work shoud be full size if any cut block adjustable than another layer?
What is Critical path in Ms-Project ?