Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / suresh,trichirapalli
Q1=2.1*1.7*0.5
Q2=(0.5-0.15)/3*((A1+A2)+(SQRT A1*A2))
A1=Area of bottom portion
A2=Area of top portion
TOTAL QTY=Q1+Q2
| Is This Answer Correct ? | 22 Yes | 8 No |
Post New Answer View All Answers
Pls explain me about tension and compression in a flat slab
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
What are advancements in civil engineering?
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
explain five benefits of using standard terminology in the measurement process?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
how much cement sand n bricks required in im3?and how much in plaster?
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
what is idealized curve for concrere and steel
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
Explain what is Critical Path Method (C.P.M)?