Answer Posted / mahammad dawood mandokhail
the volume of 1 cum cement bag is 0.034
so
1/0.034=29.41
or
one bag of cement is 50kg
so
50/0.034=1470
now
1470/50=29.41 that`s approximately equal to 30bags of cement.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
what post do you prefer to work in this company and why do you think you can serve better in such position?
satart to end steps by step process of building construction...? i want to planning theme accuretly
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
How and where are aqueducts built?
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
What is kn measurement?
How much is the cover for slab?
Wat is meant by Aecron brick?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
Why are the bolts that hold steel rails together in oval holes?
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
why the profile of shell of natural draught cooling tower is hyperabolic.
pls give me ans to ACT formula cube testing porpuse