Answer Posted / mahammad dawood mandokhail
the volume of 1 cum cement bag is 0.034
so
1/0.034=29.41
or
one bag of cement is 50kg
so
50/0.034=1470
now
1470/50=29.41 that`s approximately equal to 30bags of cement.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
why we use 19x9x9and 20x10x10 but not other
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
five benefits of using standard terminology in the measurement process
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
Basic questions of civil engineering
How high should the water tank be to provide a 60 psi at base of this water tower?
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
What is meant by a context menu in a cad software?
Where will be the maximum bending moment in a TEE Beam?
115mm thickness brick work how to required mortar
What are the applications of modulus of elasticity?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
In jack arch floor, the rise is kept?