Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / v.parthiban
a1+b1+root of a1*b1*h/3 footing size 7*7m 30cm*30cm
a1=49 b1=0.12m h=.3m
49+.12+root of 49*.012 *.3/3
49.12 + 2.425*.10
51.545*.10= 5.155cum
Is This Answer Correct ? | 14 Yes | 15 No |
Post New Answer View All Answers
Describe the role of independent Quantity surveyor?
what is the design procedure for building
what are the duties of Site Engineer in work site?
what is diversion?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
How to do bbs in excel format
how to find quantity of concrete in PCC M15
what is concrete canvas?
what is Bearing Capacity,How to determine it?
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.