Answer Posted / sanju
ELCB:-An ELCB is a specialised type of latching relay that
has a building's incoming mains power connected through its
switching contacts so that the ELCB disconnects the power
in an earth leakage (unsafe) condition.The ELCB detects
fault currents passing from live (hot) to the earth
(ground) wire within the installation it protects. If
sufficient voltage appears across the ELCB's sense coil, it
will switch off the power, and remain off until manually
reset. An ELCB however, does not sense fault currents
passing from live to any other earthed body.
RCCB:-A residual current device (RCD), or residual current
circuit breaker (RCCB), is an electrical wiring device that
disconnects a circuit whenever it detects that the electric
current is not balanced between the phase ("hot") conductor
and the neutral conductor. Such an imbalance is sometimes
caused by current leakage through the body of a person who
is grounded and accidentally touching the energized part of
the circuit. A lethal shock can result from these
conditions; RCDs are designed to disconnect quickly enough
to mitigate the harm caused by such shocks
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how to select rating of HT Panel
Is it possible to measure the voltage of a battery from a single terminal?
What is the difference between single core 2 wire and single core 3 wire system? Which application we are using this? and for What purpose we are using this?
IF 8255 CONTROL WORD IS 94H,Tell the chip port work mode ?
how to compute kAIC? with formulas...
solar inverters was not connected to the nuteral link .this nutwral possible to any other systems
For some transformers we are using solid neutral earthing while some others we are using resistance earthing why ?
Explain the propagation of harmonics in the network and influence of phase angle of harmonics.
What is the use of Surge Capacitor in LAVT?
we have require a Motor (1500kW, 6.6kV, 50Hz) which shall operate at 1500rpm during 30min and after it shall run on 500rpm during 15min. The same cycle shall be repetitive during the whole working days. Which method is best and economic to achieve such type of task. VFD, VVFD, Pole changing motor etc.
I have two PLC processors. I want to communicate both processor with each other. How i can do so?
At full load wat is the motor p.f And at no load will is the motor p.f?
why we use circuit breakers for switching instead of normal switching device?
what is the clear formula to calculate cable size for a load
What is the effect on 3phase induction motor if current setting knob of DOL kept at minimum current?