Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Is it possible to control the power in transmission lines by
remote controlling method?? if yes explain in details???

Answer Posted / k.prakashchandra

SCADA is also for controlling the load with the help of CSRs

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

state basic meaning of 'INDUSTIAL AUTOMATION'?

1949


how the phase convertor changes the no. of phases

2002


how to enter inverter parameter? without manaual?

2043


transformer spections :: input voltage 0-110-230v; output volage 0-10-12-14v; amp=3A using CRNO CORE, capcaity=50VA primary turns = ? ; secondry turns =?

2099


what should be the acceptrd value of winding resistance for 2.5MVA transformer

2310


Distinguish between nuclear power station with thermal power station for initial cost, starting period, cleanliness, and transportation of fuel

2028


Assuming that a dedicated neutral earthing transformer is provided for each GT generator, when the two generators are running in parallel, has consideration been given that the earth fault current from one generator stator winding be split between the two neutral earthing transformers? If so, what adverse impact will this have on the operation of the 59N and 27TN devices?

1668


A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .

2644


What Normal(Tangent) towers and Tension(Cut-point) Towers?

6223


Mention the disadvantages of low power factor?

1144


Dear all i want to know SEWA Electrical Supervisor Licence test Previous Year Questions ? If any body know please send to me zohairaukllah@yahoo.com

1041


Comparision of Air break circuit breaker, SF6 Circuit breaker and vacuum circuit breaker.

2380


WHY IL=IPH IN STAR AND WHY IPH=IL/1.732 IN DELTA? WHAT IS REASON BEHIND IT?

6367


How we can change the direction of rotation of Induction motor? Prove it using graphical

2184


I have two PLC processors. I want to communicate both processor with each other. How i can do so?

2167