Answer Posted / sumit
1 No. chair requierd
Any civil engineering related question contact
skatiyar011@yahoo.in
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
What is Base Shear ?
How many feet are in 4 square yards?
how do we design mix ratio?
how many tonnes equals to one cubic feet?
how many digree of freedom in four bar chain
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
What is the difference between linear dimension and aligned dimension?
What is the development length given in pile?
Wat is meant by Aecron brick?
what is the maximum number of course that can be laid according to IS code and the max height.
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)