Answer Posted / xyz
The effective stress is reduced due to upward movement of
flow of water. When the head causing upward flow is
increased, a stage is reached when the effective stress is
reduced to zero. The condition so developed is known as
quick sand condition. Quick sand is not any special type of
sand, but it is a condition of zero effective stress in
cohesionless soils.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
what is the meaning of 40/20 src
How to find out kg per Sft ?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
how can we construct building without foundation providing only grade beam at ground level
Define What is the best type of wood glue?
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
What is the diff between cad & cadd?
what is the composition of good brick ?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
pls tell me , what is the water content
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
Please tell me vasthu room sizes. Thanks.