how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)
Answer Posted / akbar khan
if you tell about both in this context,it will be highly
appreciated.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the hanekom repairing material after concreting work
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
what is mean by reestimation?
What are the Types Of DPC and its Thickness used?
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
Will water damage concrete?
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
what is meant by shear center?????
What is the sugested procedure of water purification for public supply?
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
What type of tensile strength is handling by crank in beam? Thanks.
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S