how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)

Answer Posted / akbar khan

if you tell about both in this context,it will be highly
appreciated.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What year was the keystone power plant in Indiana County constructed?

721


How to take labor charges for construction of 1cum of concrete?

681


In the roof of a pumping station explain briefly the components of a waterproofing system?

682


What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?

1009


How to cal. The weight of hollow pipe?

724






the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

1886


What is proportion of PCC Grade G?

1598


what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain

1315


(Project Management Topic) What are the important criteria in the successful realization of the project?

1664


How to find out kg per Sft ?

1802


What is a bearing capacity of soil?

811


What is the diameter of the 3"inch nails?

1519


How to calculate construction cost of residential building in mumbai

1470


What is an ice dam sock?

703


can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...

1665