Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how much fuel is consumed on full load for a 500KVA Diesel
Generator in one hour.

Answer Posted / vignesh.raja63

2.5 liter of diesel for need to obtaine the 500kva per 1hr

Is This Answer Correct ?    1 Yes 16 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How do you control cylinder liner wear?

2012


List the energy saving opportunities in air compressor system.

1546


Define earth lamp?

2333


why centrifugal pump used in I.D.fan and axial pump in F.D. fan

2446


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

1821


hi sir my name is srikanth plz send me question papers

1857


HOW MANY PSI CAN REACH THE SCHEDULE 20,40,80 PIPES? GI,BI (CAPACITY OF PIPES)

2112


Is the hvac machines are designed 10% less than the electrical feeder value?

1764


What are the different theories of failure under static load, explain ?

1222


What is the purpose of a de-superheater?

2144


Which factors influence the type of fracture in failure of a material ?

1072


how to select the capacity of an exhaust blower( exhaust booth) in an automobile industry.

1959


what is the thickness tolerances up to 32 mm

2079


about induction motor

2003


What is coaxing ?

1305