how to calculate concrete qty for footing using M25 grade
1:1:2 for 731 cft.
Answer Posted / sumanth
we can only calculate the quantity in m3 only after that we
can converet in c.ft.
1/4 x 1.54 x 28.8= 11.08 bags cement for 1 m3 for the ratio
of 1:1:2
s0 731 cft = 20.719 m3 * 11.08 = 229.570 bags cement used
1/4 x 1.54 = .385 m3 sand for 1 m3
so 20.719 m3 x .385 = 7.976 m3 sand required in 731 cu .ft
2/4 x 1.54 = 0.77 m3 chips ( aggregate ) for 1 m3
so 20.719 m3 x 0.77 = 15.953 m3 chips required in 731 cu .ft
Is This Answer Correct ? | 15 Yes | 10 No |
Post New Answer View All Answers
How do you compute the volume of airflow?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
Why nautical mile is different from statute mile?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
Does VDF add strength to the flooring apart from preventing water ingress?
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
what is moment-curvature relationship in semi rigid connections??
what is pqc
how statics is different from dynamics
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
What is the use of array command?
What is 1/8 on the architect ruler denotes?
door and window wood work calculations and different methods
how much cost of single coat 20mm thick plastering per sqre meter