how to calculate concrete qty for footing using M25 grade
1:1:2 for 731 cft.
Answer Posted / sumanth
we can only calculate the quantity in m3 only after that we
can converet in c.ft.
1/4 x 1.54 x 28.8= 11.08 bags cement for 1 m3 for the ratio
of 1:1:2
s0 731 cft = 20.719 m3 * 11.08 = 229.570 bags cement used
1/4 x 1.54 = .385 m3 sand for 1 m3
so 20.719 m3 x .385 = 7.976 m3 sand required in 731 cu .ft
2/4 x 1.54 = 0.77 m3 chips ( aggregate ) for 1 m3
so 20.719 m3 x 0.77 = 15.953 m3 chips required in 731 cu .ft
| Is This Answer Correct ? | 15 Yes | 10 No |
Post New Answer View All Answers
what are the types of design? which type of method is used at what type of design & why?
how many time use of plywood shuttering and IS code
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
Why are separation membranes used between concrete pavement slab and sub-base?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
Explain what is alternate bid?
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
What is Joule Brayton Cycle?
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
What do you understand by “preset” during the installation process of bridge bearings?
what is the mix design for M:60 with micro silica andmetakaoline?
how do we design mix ratio?
what is difference between fluidity and workability also how palsticizer works