Answer Posted / arun
CIVIL ENGINEER IS ONE WHO MINIMIZE THE COST OF CONSTRUCTION
WITHOUT EFFECTED THEIR QUALITY.
| Is This Answer Correct ? | 41 Yes | 4 No |
Post New Answer View All Answers
How to calculate brick work quantity?? Block work quantity??
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
Describe the role of independent Quantity surveyor?
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
what is Brick crushing strength(PSI)?
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
How did the romans get water up hills using aqua ducts?
how to create our resume?
how clculate excavated or backfilling quantity by simpson's rule
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
what is the weight of 10mm,20mm,40mm aggregate
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
What is the difference between one-way slab and two-way slab?