Construction joint is the joint provided without
interlocking two different designed structures having
different properties in terms of cc, rcc, pre-cast, various
grades, design etc. Different ratio of expansion &
contraction between two different structures has to be
neutralized to avoid any damage in structure.
Expansion Joint is especially provided to maintain the
changes in the dimension of the concrete mass due to the
effect of temperature on construction material like steel,
cement, aggregates and any material or object is in
conjuction with.Also entire part is not affected by any
settlement of base or related strucures.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How much cement,sand,bricks and water needed for 1square metre brick work?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
what is the mix design for M:60 with micro silica andmetakaoline?
how clculate excavated or backfilling quantity by simpson's rule
Define What is a projection line?
Are cruise ships built for the transatlantic run?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
Does VDF add strength to the flooring apart from preventing water ingress?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
What is M40 _ TOR - EQ and B.F.S