how to calculate concrete qty for footing using M25 grade
1:1:2 for 731 cft.

Answer Posted / dharmesh patel

we can only calculate the quantity in m3 only after that we
can converet in c.ft.
1/4 x 1.54 x 28.8= 11.08 bags cement for 1 m3 for the ratio
of 1:1:2
s0 731 cft = 20.719 m3 * 11.08 = 229.570 bags cement used
1/4 x 1.54 = .385 m3 sand for 1 m3
so 20.719 m3 x .385 = 7.976 m3 sand required in 731 sq .ft
2/4 x 1.54 = 0.77 m3 chips ( aggregate ) for 1 m3
so 20.719 m3 x 0.77 = 15.953 m3 chips required in 731 sq .ft

Is This Answer Correct ?    41 Yes 18 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.

2135


what is conrete grade ,how are depent on concrete grad and size of concrete?

2032


In case if concrete box girder bridges how is the number of cells determined?

701


how much quantity of cement,sand and water required for 1 sq feet flooring work .

1987


what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete

3520






How many days should curing of plastering, brick work and concrete

1199


For fine aggregate which is most suitable River sand or crusher sand & why ?

1318


for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)

1778


Why is the use of granular sub-base in concrete carriageways not preferred, explain?

760


how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6

5787


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

1514


how to calculate mivan shuttering matrial

954


what values & beliefs have guided you in your career path

2765


How to fix toll charge for a particular vehicle at toll booths in a highway?

1487


how to calculate rate analysys of 1:6 plastering 10 sq m

2497