how to calculate concrete qty for footing using M25 grade
1:1:2 for 731 cft.
Answer Posted / dharmesh patel
we can only calculate the quantity in m3 only after that we
can converet in c.ft.
1/4 x 1.54 x 28.8= 11.08 bags cement for 1 m3 for the ratio
of 1:1:2
s0 731 cft = 20.719 m3 * 11.08 = 229.570 bags cement used
1/4 x 1.54 = .385 m3 sand for 1 m3
so 20.719 m3 x .385 = 7.976 m3 sand required in 731 sq .ft
2/4 x 1.54 = 0.77 m3 chips ( aggregate ) for 1 m3
so 20.719 m3 x 0.77 = 15.953 m3 chips required in 731 sq .ft
| Is This Answer Correct ? | 41 Yes | 18 No |
Post New Answer View All Answers
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
What is geopolymer based concrete?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
What is the tensile strength of wood?
Explain the water bound macadam roag
What are moment of inertia and its importance in civil engineering?
What are the common ways of demolition?
What do you mean by the word 'shear'?
How to plan a project
what is differences between ferrock and concrete ?
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
how much shouid be the rate for ready mix concrete per cubic meter
what is the difference between np2 and np3 concrete mix