how to calculate concrete qty for footing using M25 grade
1:1:2 for 731 cft.
Answer Posted / dharmesh patel
we can only calculate the quantity in m3 only after that we
can converet in c.ft.
1/4 x 1.54 x 28.8= 11.08 bags cement for 1 m3 for the ratio
of 1:1:2
s0 731 cft = 20.719 m3 * 11.08 = 229.570 bags cement used
1/4 x 1.54 = .385 m3 sand for 1 m3
so 20.719 m3 x .385 = 7.976 m3 sand required in 731 sq .ft
2/4 x 1.54 = 0.77 m3 chips ( aggregate ) for 1 m3
so 20.719 m3 x 0.77 = 15.953 m3 chips required in 731 sq .ft
| Is This Answer Correct ? | 41 Yes | 18 No |
Post New Answer View All Answers
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
What is the density of DLC & PQC and how it is differ from normal concrete?
what are the code used for residental building?
Soil bearing capacity formula
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
What is absolute pressure? How absolute pressure is calculated?
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
what is w/c ratio in dry lean concrete for m10 mix design
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
Define What glue is least sticky?
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
What is a projection line?
List out the potential risk factors for workers on the construction site?