Answer Posted / vijayaraj24
1.674
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Forces in a Shear Wall are in plane or out of plane ?
What is the worlds largest concrete dam?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
How much does the leaning tower of pisa lean?
How much cement,sand,bricks and water needed for 1square metre brick work?
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
how to caluclate sienerge qty in construction in ap
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
What are the different approaches in designing the floors of the service reservoirs?
What are the different types of civil engineering?
pile load testing procedure
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
List out some of the checking’s, done at the completion of construction?
What quantity of 1.0 m3 bricks required?