what would be the rqmnt. of cement and sand (1:6)for
building brick wall and also 20mm thick plaster on the wall
by same ratio?
Answer Posted / p.rambabu
1.approximately we can calculate the requirement of brick
work for 1cum of 1:6 ratio
ans:cement=(1/6)*1440=239.999*0.21=50.399/50=1.007bags/cum.(here
the ratio of 0.21is the approximately dry volume of sand).
2.for 20mm thk plastering calculation,
a.first we can calculate the volume of plastering area,
b.increase it's volume to 20% because of the honeycomb
work& miscellaneous works.
c.multiply this value with dry volume of 1.3.
for 1:6 for 20mm thk of 100sq.m
cement=(1/7)*1.3*2.2=0.408*1440=587.52/50=11.750bags.
Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
why are you joining in this (applied post) job and your aim for this job
what is the coefficient for running feet to cft coversion both area and price
what is the meaning of 40/20 src
What is the outturn of Ceiling plastering
what is the dimensions of river sand truck trailer or trolly ?
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
What is c.g.i sheet which used for roof??
what is flexible and rigid footing?
What is packing Factor ?
what is difference between fluidity and workability also how palsticizer works
what is shuttering co efficient?