Answer Posted / mohammed mohiddin
Approximately 1.5 to 2% of the steel weight
i.e, 15 - 20 kg
| Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
can you give me the details of rate analysis of steel and concrete?
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?
how can calculate cutting length of diamond ring
types of laps in column
What things architect have to take care of before starting any project?
What is the strength of 1:6:12 mix?
Explain what are the problems one might face while having a Cantilever balcony?
How cracks in concrete can be avoided?
How to calculate chejja reinforcement
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?