Answer Posted / mohammed mohiddin
Approximately 1.5 to 2% of the steel weight
i.e, 15 - 20 kg
Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
Which are the top apps for you civil engineering?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
what is the design procedure for building
mix design procedure for 1:6 cement mortar
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
Explain the various stages of the project planning process in construction?
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
how to absorb to site basic corrections? which are the important correction?
Explain what are the phases inspections are done by local authority while construction?
what does the track parameter mean in staad.pro?
what is escalation?how it is done?
which method is used in semi-rigid connection design??
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
Define What is the origin of name Railway Sleepers?