Answer Posted / mohammed mohiddin
Approximately 1.5 to 2% of the steel weight
i.e, 15 - 20 kg
| Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
Why joints are provided?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
pls give me some basic informations in construction of a structure?
how to calculate the scour depth
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
How long does it take concrete to harden?
How to take labor charges for construction of 1cum of concrete?
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
how much quantity of cement,sand and water required for 1 sq feet flooring work .
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is Architect-Prepared Contract?
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
How does a traffic light signal work ?