Answer Posted / jugal soni
PT is a potential transformer which use to measuring a voltage
EMVT is same as the PT both are the use for the volage
measuring but accuracy is high of the EMVT.
CVT is voltage transformer but it works on capacitance. and
it is also used for the PLCC.
Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
IN dc capacitive reactance is??
Why does the adjacent zone of protection overlap?
When are the directional relays used?
why ct's&pt'S out put called as burden,why compelsary short ckt the secondary of ct's while removing the burden?
Hi guys! Plz help me to answer the following questions. 1. What are the types of transmission line energy losses? 2. Why are the VLF are used some types of services? 3. What frequencies are used for reliable beyond the horizon terrestrial communication without repeaters? 4. To permit selection of 1 out 16 equi-probable, what is the number of bitis required? 5. What is the most common modulation used for telegraphy? 6. What is the multiplexing is used to increase the capacity of the optic fiber? Thanks
how the synchronizing is obtained at bus couplers in grid substation? (because there we cannot change the frequency in one of transmission lines like in generator synchronization)
how you will decide the distance between the power transformer and its fencing
H.t motor 6600 volt to same motor lt supply 440volt supply applyed to h.t motor to effect....
what is the circulate the diesel in DG in side pls tell parts name and picture with circulate the diesel
Hello Friends, How can we recognize the CT Star Point is S1 or S2 in case of Electro Mechanical Relays and what is meant by Restraining coil in relays and what is the purpose of that.. thank you in advance..
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
Why in metering Ct for ammeters ct secondary side is grounded for each Ct but not in case of CBCT (Core balance current transformer)..kindly some1 highlights the reason..is it because net flux is zero?
A 2083kva AVR was tested, phase to ground shows continuity, what is the implications
what is the maximum permissible limit value of leakage current and leakage counter reading to replace lightining arrester?
what does a k rating in a transformer means?