what is the difference between NP2 Class and NP3 Class RCC
Hume pipes
Answer Posted / dinesh singh bisht
NP 3 thickness greater Than Np2 Pipe
| Is This Answer Correct ? | 14 Yes | 8 No |
Post New Answer View All Answers
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
what is the design procedure for building
calculate the quantity of water for 1:6 cement mortar
to draw bm diagrams for portal frames under different loadings//
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
Permissible wastage of cement as per IS code ? In which IS code I get it?
Aptitude, reasoning, quants, verbal and technical question
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.Â
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
Why the finite element method is lower bound solution?