Answer Posted / prakash
due to SHEAR
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what are the duties of Site Engineer in work site?
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
what is moment-curvature relationship in semi rigid connections??
How many bricks are there in 100cft?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
(Project Management Topic) What are the important criteria in the successful realization of the project?
How much of the strength of concrete comes from post- production curing?
What are the phases inspections are done by local authority while construction?
how to calculate the strength of rebound hammer test reading in building construction ?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
psc girder detail
How are freeway bridges built?
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?