what"s the formula to find the cement,sand,aggreegate(45mm)
requirement for PCC?
Answer Posted / shailesh
For 100 cum
Cement should be in kg=(152/sum of proportion)*cement density
Sand should be cum=(152/sum of proporation)*sand ratio
percentage
Aggregate shuid be in cum=(152/sum of proporation)*
percentage of aggreagate
For PCC 1:4:8 (100CUM)
Cement=(152/13)*1*1440=16836.92kg
Sand=(152/13)*446.769 cum
Aggregate=(152/13)*8=93.53cum
Is This Answer Correct ? | 16 Yes | 12 No |
Post New Answer View All Answers
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
What is absolute pressure? How absolute pressure is calculated?
What are the joints wants to made in masonry where door opening, arches like etc..
how we calculate the vol.of wet concrete..?
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
What is quantity of cement and sand required for 2000sqft of tiling?
Explain the water bound macadam roag
What are wooden shingles?
What is the Hardness of M-40 grade concrete, general and theoratical
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
What is the zero value in quantity surveying
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
What is the name of this multiplication factors ?