what"s the formula to find the cement,sand,aggreegate(45mm)
requirement for PCC?
Answer Posted / shailesh
For 100 cum
Cement should be in kg=(152/sum of proportion)*cement density
Sand should be cum=(152/sum of proporation)*sand ratio
percentage
Aggregate shuid be in cum=(152/sum of proporation)*
percentage of aggreagate
For PCC 1:4:8 (100CUM)
Cement=(152/13)*1*1440=16836.92kg
Sand=(152/13)*446.769 cum
Aggregate=(152/13)*8=93.53cum
| Is This Answer Correct ? | 16 Yes | 12 No |
Post New Answer View All Answers
What is the largest concrete dam in the world?
How to arrive dry volume of concrete (1.52 to 1.57) ?
What applicable rate of wct in bihar
What is absolute pressure? How absolute pressure is calculated?
I need old MMUP exam question and answer for Civil engineering
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
How is the leaning tower of pisa supported?
How long does it take concrete to harden?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
how much used soil in 1 brick of standard size?
For the construction project what capital cost has to be taken in consideration?
How do we determine the specific gravity of a cement?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
List out the types of roofs?