WE HAVE A LOAD OF 55KW MOTOR ITS VOLTS 380 3PH AND ITS
TAKING 100AMPS (ITS FULL LOAD IS 105AMPS)AND ITS CABLE IS
4CX50SQMM ,NOW ITS GETTING ABNORMAL HEATUP IN CABLE,PLZ
TELL WHY ITS HEAT-UP?(CABLE LENGTH IS 15 METERS ONLY)
Answer Posted / mohammad a.monem salama abu se
THE RERATING FACTOR MAY BE VERY LOW BECAUSE OF EXISTING
GROUP OF CABLES IN THE SAME TRENCH OR ANY OTHER REASON .YOU
HAVE TO KNOW THE CONDITIONS OF THR AREA WHERE THE CABLE IS
LAID.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
why we testing the core balance of the transformer before comissioning?
Why earthing is necessary for any equipment?
why the rotor current becomes in steady state during high slip region? please verify with equations.
In case of HV test on medium voltage cables, BS is asking for 4 U0 where as IEC is asking for 3.5 U0. Can any one advise me how this 3.5 times or 4 times U0 is derived?
Is there any question in the name of Static Switch in UPS??
i have attended the interview on 4th June,08 at Kolkata in IOCL, can anybody tell me what is its result
what is DRP panels?
defination of lines
Factory acceptance test. FAT. For 132 kv transmisstion towers what is that meaning and what are the tests commonly companies perform now days.
which cable is used for 15 Hp monoblock pump 3phase and service wire Distance is 210 feet please tell me cable size Armaured
what is a pulse transformer? how rise time of pulse changes when ever the voltage changes?
(In MEP services) HVAC in AC Plant room what else can we provide if the chiller is not considered?
how to synchronize 3 phase slip ring induction motors of different ratings.
for a 400kv t/m line with 10 ampere current will corona occur?