what will be the quantity of matterial and water for pcc in 1
cubic meter , the ratio is 1:4:8 (cement:sand:aggr) ?
Answer Posted / australian
for cement,
Dry volume=1.57 cum
so 1.57/13=0.12*1440=173.90 kg
Number of bags=174/50=3.5 bags
and water=85 liters
| Is This Answer Correct ? | 8 Yes | 3 No |
Post New Answer View All Answers
how to find out hard strata in bored pile when the DMC method adopted.
How do we test on design and style in a software?
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
How will be cutting in timber plate size 600*400 column size
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
What is the biggest dam in america?
reinforcement slab, beam and column formulas?
natucher of concrete &type of concrete?
What is meaning of tlc
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
Define What is a kip?
all technical question