After fault clearing in Tr line, whether the Metering core of
CT is comes to normal condition from saturation region & its
works as a normal condition?
Answer Posted / j.karthik
yes,metering core C.T comes to normal position after fault
clearing in the Transmission line....
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is power distribution criteria for converting single phase unbalanced residential load to 3 phase star connected balance system. Does total KW converted to 3 Phase. Means Divided by root 3.
What is T’Q and X’Q and X’D ? and what is saturated as well as unsaturated ?
if main CT is of ratio 50/5, and meter CT is -/5 what will be overall multiplying factor of meter.PT is 11000/110 .
what are your career plans upon completion of the programme and the relevance of recity generation to your professional development?
What difference between ref protection and differential protection ?
What happen to generator if i have unbalanced load?
Do Phase angle measurement have any application in freq/harmonics measurement? If so how?
What are the basic properties of signal flow graph?
what is calculation mathod/formaulla for deciding Size of busbar (Copper/ aluminum)for L.T. panel on Various Fault level like 50kA,25kA,10kA
What do you mean by cogeneration? What its working principle?
Plz tell me how we can find that particular company has vacancy or not
Why is the frequency not changed during transformation of electrical energy in a transformer?
While performing stability test of differintial cts how to know the voltage and current on both side of the transformer?
describe the constructional features of an auto transformer and its principle operation
what is th basic difference between a d latch time line and a d flip flop time line???