A pressure transmitter with a range of 0-100 bar.The
accuracy of the instrument is 1% of upper range value?
The pressure indicating transmitter is showing the system
pressure is 50 bar.
b. When you include the error, what is the minimum possible
pressure in our fuel gas system?
i. 49.5 bar
ii. 49 bar
iii. 1 bar
iv. 0.5 bar
We want to change the filter cartridge. We must depressure
the fuel gas system.
c. After we depressure the system in preparation for
maintenance, the transmitter displays a pressure of +0.1
bar. At this time, what is the possible range of pressures
in our fuel system?
i. +0.099 to +0.101 bar
ii. 0 to +0.2 bar
iii. -0.1 to +0.3 bar
iv. -0.9 to +1.1 bar
Answer Posted / syamesh
FOR THE FIRST QUESTION ANS IS 49 BAR AND FOR THEW SECOND ANSWER IS -O.1BAR
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
what is 24vdc live and dry supply
NPN transistor, SCR, Zener diode, LED, Varactor diode, Vortex meter, RTD, Resistor, Crystal
please send me some question papers of HPCL aptitude test ?? please send it to bipinb.28@gmail.com ...
what is the input of digital counter during the the calibration time?
what is scale factor of proximitor & unit of the vibration.
How do you identify between actual alarm and false alarm in a Temperature Transmitter in SCADA based Control System
in sulfur process what is material of impulse line we use to connect with transmitter ? and does teflon affected by sulfur?
what is the usage of QDV & VOLUME BOOSTER
what is different between 2,3&4 wire rtd and how much maximum distance using plc to field.
In a gas over oil actuator, after the opening/closing of valve, how the gas is vented out? How does the hydraulic/gas circuit function?
how will you check torque value during Factory acceptance Test for control valve/ESD ON/OFF VALE how will you confirm this torque value is being correct, Which document will you be refer.
can you provide me full detail about instrumentation in ONGC??
Difference between 2-Valve Manifolds, 3-Valve Manifolds and 5-Valve Manifolds 3 with diagram
What are continuances of connecting earthing and shield of branch cables (instrument to Junction box), at the same earthing pot provided on JB? Is it ok, or may produce some problem?
for oil & gas industries which zone is normally preferred? why? give its example?