WHAT ARE THE SITE TEST APPLIED ON A SURGE ARRESTORS? DO
MEGGER TEST APPLIED ON SURGE ARRESTOR? IF YES THEN WHAT ARE
THE ACCEPTED IR VALUE REQUIRED FOR SURGE ARRESTORS FOR
VOLTAGE LEVEL 11KV, 33KV, 66KV 132KV, 220KV AND 400KV?

Answer Posted / amji r jadhav

the megger test ir is infnt 0 your ans but 33kv line charge in the stand by minimum 10mgo this is the megger value

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how is capacitor bank look like

1913


HOW CAN WE DECIDE THE SUPPLY VOLTAGE FOR MOTOR ACCORDING TO ITS RATING(IF ANYONE KNOWS GIVE IT WITH EXAMPLE AND ITS CALCULATIONS)

1495


As a electrical engineer.. what are the basic norms should follow in transformer oil testing.. 1.What is the Electrode type? 2.How long time you will give for oil testing?

3077


fuel-air ratio in a petrol engine fitted with suction carburettor,operating with dirty air filter as compared to clean filter will be

606


What is the difference between the relay and the circuit breaker?

597






why we can stote dc? why we cant store ac?

1598


How can we increase the capacity of Energy.?

1664


How we calculate the Multiplying Factor of Kwh meter for 3 phase alternator.

1399


what is earth resistance? how to measured? and give values at power station and mcc area?

1499


How to work definite,over pluxing,revers power,OSR relay

1231


What will happen if the voltage in my house drops from 220V to any lower voltage?

1639


how can we say that stator magnetic field rotates with synchronous speed?can we derive?

1289


I am designing new project sub station with 220 kV / 11 kV, 40 MVA capacity. This project have many recifier sets, which can generate 3rd harmonics. Now I have to select vector group of This transformer. To minimise 3rd harmonics, what care should I take in selection of Transformer Vecrtor group? If it is Y-Y with open Delta tertiary then what should be the rating & voltage of Tertiary Winding?

1434


How is operate breaker failure scheme in substation

1523


Draw a block diagramof Three UPS systems connected in Parallel mode?

1655