What are the types of Road in India?
Answer Posted / v.b.m.sastry.kotha
1. ALL WEATHER ROADS
2. FAIR WEATHER ROADS
| Is This Answer Correct ? | 12 Yes | 14 No |
Post New Answer View All Answers
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
can stub column take the load as main column
what is BPM in concrete demolition hammers. what is better a higher value or lower
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
on what basis the partial factor of safety are decided? form the load combinations
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
Basic questions of civil engineering
What is the purpose of the gap in the road on this bridge?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
Why are separation membranes used between concrete pavement slab and sub-base?
whats is difference between anchorage length and development length
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
can i get civil engineering test papers.......?????
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?