Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Where double earthing is required? Is there any power
specification to have double earthing?

Answer Posted / satya narayan dutta

no power specification is limited for double earthing.Doube
earthing is required all medium and high voltage
installation.

Is This Answer Correct ?    20 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is inverse definite minimum time lag relay? Where is it use?

2825


How we calculate the Multiplying Factor of Kwh meter for 3 phase alternator.

1894


how to select size of hardware for linking aluminium busbar is it depend on area of busbar or current flowing through bus bar

2027


aternator every parts and its working

1633


Please tell me the earthing procedures adopted for the STAR-STAR 3 Phase transformer in india and give a better sugession for earthing

1966


Starting Time of LT & HT Motor

1958


What is the end effect of linear induction motor ??

2031


Why do we perform an open-circuit test and short-circuit test on the transformer?

1124


a starter used for squirrel cage induction motor?

1687


What is the loss of transformer of 220kv/11kv, 63/80 MVA and 18.05% impedance

2003


why motor range is available 22kv,30kv,37kv,45kv and so on? why motor range is not available 21kv,24,25,26,27kv and so on?

2799


what is the meaning of 0.5ohm Resistance

1861


Why dry type cast resin transformers tap link blast in HV side while power shut down times on load?

2330


we have earthmat at 110KV substation.we would like to take earth resistance.b some says that by connecting earth megger terminals (C1,P1) at middile point of earthmat (at riser) will cause voltage gradient at other earthmat nods and dont get exat earth resistance.when connecting at end nods will get exat value . is it correct .please explain

2222


use of choke in APFC panels

5828