what is meant by velocity & gravity ?what is the difference
between normal liquid flow & gravity liquid flow ?
Answer Posted / bert05
velocity is the measurement of the rate and direction of
change in the position of an object
Gravity is a force pulling together all matter (which is
anything you can physically touch).
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
what is pouring and explain
Explain the various stages of the project planning process in construction?
what are the layers of the national and heir aprox thickness??
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
what radial pressure, the NP2 class rcc pipe can sustain?
how do we design mix ratio?
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
what isload waring calculation
How do we determine the specific gravity of a cement?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
indian standard split spoon sampler
How to do base isolation for RC framed structure using ETABS software?