How much kilogram of binding wire required for fabricate
one Metric ton of reinforcing steel
Answer Posted / rr
6-9kg
Is This Answer Correct ? | 17 Yes | 3 No |
Post New Answer View All Answers
Describe the various methods of concrete curing?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how i get all type of short type question answer about civil engg
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
Coverage of 25mm.thick ratio of 1:4 cement mortar?
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
What is difference between code and standard and specification?
how clculate excavated or backfilling quantity by simpson's rule
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Explain what are the phases inspections are done by local authority while construction?
Define current ucs?