I need to plaster an area of 1500 square meter. how much
quantity of cement and sand need for this.?

Answer Posted / ahmed

Cement-1mt2 @10mmthnk-15.62Kg required Ratio 1:4
Sand=1mt2 @ 10mm thnk- 62.5 kg required
u need-468.6 bags of cement
U need-1875 Bags of Sand

Is This Answer Correct ?    4 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Doul Bar reinforcement and details of drawing.

1919


which red: used in roof teping, then use only cement

1558


What are advancements in civil engineering?

647


How to calculate steel for beam slab and column

1361


Discuss some applications of modular elasticity?

753






residential projects,structural.

2407


What is the maximum strength of cub compress strength in one cub testing

1381


The portion of a brick cut across the width is called?

965


Moisture content calculation for diff mix ratio's ??

1205


how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...

1897


How to calculate woden area in sft and Cft

1100


please briefly explain calculating or estimating steel quantity for a RCC column?

1439


what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)

1279


what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?

1560


how many BSCs can i connect to the HUAWEI MSC

1836