I need to plaster an area of 1500 square meter. how much
quantity of cement and sand need for this.?
Answer Posted / ahmed
Cement-1mt2 @10mmthnk-15.62Kg required Ratio 1:4
Sand=1mt2 @ 10mm thnk- 62.5 kg required
u need-468.6 bags of cement
U need-1875 Bags of Sand
Is This Answer Correct ? | 4 Yes | 12 No |
Post New Answer View All Answers
Doul Bar reinforcement and details of drawing.
which red: used in roof teping, then use only cement
What are advancements in civil engineering?
How to calculate steel for beam slab and column
Discuss some applications of modular elasticity?
residential projects,structural.
What is the maximum strength of cub compress strength in one cub testing
The portion of a brick cut across the width is called?
Moisture content calculation for diff mix ratio's ??
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
How to calculate woden area in sft and Cft
please briefly explain calculating or estimating steel quantity for a RCC column?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
how many BSCs can i connect to the HUAWEI MSC