I need to plaster an area of 1500 square meter. how much
quantity of cement and sand need for this.?
Answer Posted / ahmed
Cement-1mt2 @10mmthnk-15.62Kg required Ratio 1:4
Sand=1mt2 @ 10mm thnk- 62.5 kg required
u need-468.6 bags of cement
U need-1875 Bags of Sand
| Is This Answer Correct ? | 4 Yes | 12 No |
Post New Answer View All Answers
What is the meaning of a blue land surveyors flag?
Which are the top apps for you civil engineer?
Which stone is best for wall construction Laterite Stone or Cement Blocks
Define absolute co-ordinates?
why does the most of civil engg is not intersted to going for teaching field?
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
Why the finite element method is lower bound solution?
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
Can inverted beams used in pipes during construction?
hi guys what happens if you are absent for a supplymentry exam?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
What is the significance of cost estimate knowledge for an architect?
why development length = 50D . why not 100D