what is resticted earth fault protection ? how did it
protect & work in power transformer
Answer Posted / sumit
REFP is mainly used for high speed tripping on star connected earthed secondary winding of power transformer
The relay does not operate for fault beyond the protected zone i.e neutral of the transformer.
Fault occurring near neutral is having small current becoz of small voltage which results in low fault current. To attend this fault the relay must be too sensitive to operate .To operate, the relay is set for the earth fault current of the order 15%of the rated winding current which protects restricted portion of the winding.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What are the no-load losses for the 11000/415V transformer with the following rated capacity? 1.1500 kVA 2. 2000 kVA 3. 2500 kVA 4. 3000 kVA
what is the earth current,reverse power,electrical trip generator short circuit,low voltage, high voltage please discribe me
transformer phasor diagram under load explain it?
Can any body tell me about INNER SHUNT COMPOUND MOTOR diagram?
slipring induction motor starting time Lrs operating why lrs starting time lrs outer body didn't get shock
what is dry and wet frequency withstand voltage? why & where it is used??
What happened ,If 3 phase clearance not maintained in 33KV Line,11KV LIne etc?
what are the 4 rules to start the motor?
Apparent power is expressed as V * I(Conjugate). Why not in V * I ?
Define piezo-electric effect?
what is the concept of directional power?
I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.
what purose of the double circuit transmission line phase of the line phase changed for circuit-1 for Circuit-2 R-Y-B B-Y-R
what is the significance of terminal voltage and phase sequence in the operation of paralleling of two generators?
According to IEC60034-14, When the vibration monitoring system required for motor Bearing. above which KW, it is required? and for what type of bearing the vibration probe is provided.