i have seen a picture of a power plant. in that pic. i saw
chimney like giant structure which were spreading smoke like
something...i want to know is it chimney or cooling towers, as
my friends use to say.
Answer Posted / imran
In thermal power plant there are two types of chimeny one for smoke emission and other is cooling tower. Cooling tower are hyperbolic in shape its diameter at pond is about 70 mts and diameter at the top is about 42 mts, . cooling tower are very lager as compare to smoke emission chimney in power plant.
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What are operating procudures & Safety precautions to be observed while operating OLTC in manual mode ?
please send previous exams question papers
What is the exact formula for one weber of magnetic flux?
Define the term Capacitance and Inductance?
what is the advantages og idmt relay over magnetic relay??
What is the reason behind current flow(20 A) in amain earth cable of an SMDB? Is cuurent flow(45A etc) through a neutral cable acceptable?
PLZ SEND ME SOME UNIQUE PROJECT OF ELECTRICAL ENG (B.TECH)
What the difference between three phase contactor (coil 110vac) & three phase SSR (control voltage 110Vac)? May I use contactor in place of SSR?
Why we are using only Dyn11 tranformer in distribution system but not using a Dyn1 in distributing system?why not and advantage and disadvantage in both
please suggest some good universities with low cost iam in totally full confusion so please help me my profile gre 283 and ielts 5.5
WHAT IS MEANT BY OVER EXCITATION IN GENERATOR TRANSFORMERS? DESCRIBE IT.
What is the difference between a verilog task and verilog function?
what is mppt (maximum power point tracking ) and how they used in solar power generation ??? what are the main components used in mppt?????
1. How many types of mangers? 2.How many types of capacitors? 3.pls tell me normally types alternator problems?
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.