Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the powerfactor

Answer Posted / kavitha.s

it is ratio of active power to apparent power is called
power factor. it is expressed as PF= KW/KVA

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is meant by time harmonics and space harmonics?

2807


How to design a Unit auxiliary transformer for a power house having a unit of 65 MW and Generating voltage of 11 KV and Secondary voltage of 433V

2137


Name the test signals used in control system

1291


How much load can take a 16 mm aluminum cable 3 phase

1752


How can we calculate the KVA rating of a Distribution transformer from its core details?

2079


What are the main advantages of generalized error co-efficients?

1178


Why L.T.Cable voltage rating is 1.1kV,where as system voltage is 0.415kV?

2349


What is the lifetime of a Thyristor? Is there a recommended lifetime for thyristors after which they should be replaced?

2719


HOW TO SELECT THE COPPER CABLE SIZES OF MOTORS,TRANSFORMERS?

2120


any application of back emf

2128


Did RMU have ct and pt ?

1362


What is the formula to calculate the no load current of a single & three phase induction motor

2283


What is the Resposiblity of Electrical Utility Engineer

2929


An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.

7709


how to size H.T & L.T Panel ?

2134