why we are doing post tensioning in beams and slabs.
it is economical compare to rcc? how?
Answer Posted / sunil1505
ECONOMICAL BUT ITS RISKY FACTOR...ACTUALLE THEY R RECOMONDED
ONLY TRAFFIC AREAS BECAUSE IF TENSIONING GETS..WE GET LOT OF
AREA.THERE IS NO REQ TO BULIT EXTRA SUPPORTS TO THE STUCTURE
AND IT HAS THE MORE SAFE LOAD CAPASITY THAN R C C
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
What is the distance between railway tracks?
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
what is the construction cost for per cft of multistorryed building in kolkata?
List out some of the common problems that architect have to tackle it?
List out some of the checking’s, done at the completion of construction?
Which type of plywood & sizes using in construction projects ?
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
how many kg of 20mm, 10mm, dust available in one ton stone boulder
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?