Answer Posted / prasad
interconnection of generating stations to meet the power
requirement.....
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is meant by rotor?
How phase to phase voltage comes 440V.
what is the safety points of vaccum circuit breaker.
Why squirrel cage motor can only use with low starting loads ?
Define norton equivalent circuit?
what is the path of thunderlightening? once both a buffalo and a person were standing 5m apart but lightening hit and killed buffalo not person?
In Power Line Communication (PLC) the wave trap is used to block communication signals from entering neighboring lines. My question is this: Why do they allow for different filtering arrangements on these wave traps? Isn't it always going to be a low pass filter since we want the power frequency to go through, and the comm signal blocked?
Differentiate between real and apparent power?
What effect does a very low impedance have on the Voltage regulation? On the short-circuit current?
i ha done my 10th with 71% ,ITI with 81% 11th with 75% 12th 43% apprentiship with 71% in SAT i secure 1390 ,TOEFL 27 i was refused four times and in all me interview visa officar told that i am not Qualify for study in USA but i completed my 12th yes i got low persentage in my 12th but i seen to much student they already got visa with them 3 or 4 backlocs so why they are refused me ?
What is the difference between diode and a transistor in terms of the direction of current flow?
What is expention fastener (Fan)
how to minimize earth resistance upto 2Ω, if the resistance is 6 Ω ?
while doing high potential for 11KV 3 core cable how much leakage current will obtain?, what will be acceptance value?
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)