Answer Posted / ahmed
Lap Length Should be 50xD or 40xD You can take
or Els As per Specification
| Is This Answer Correct ? | 72 Yes | 12 No |
Post New Answer View All Answers
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
explain what do you mean by the property development.
What are some structures that may be subjected to fatigue?
What are segregation and bleeding?
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30
How to take labor charges for construction of 1cum of concrete?
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
Different sizes of Hollow blocks and its weight. Thanks.
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
How to calculate plastering for elevated water storage tank
how calucate cement sand ratio for plstering
Name the main components of a cad gui?
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m