Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the compresive strength of m20 concrete at 7 day

Answer Posted / prabin j

it should be 67% in 7 days. 13.4 N/mm2

Is This Answer Correct ?    18 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the hanekom repairing material after concreting work

2396


What are the different methods for drawing an arc?

1219


Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet

2829


How to design staircase.plz tell me formula for the design the staircase.

1942


Define What is the best type of wood glue?

1137


If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US

1709


why does the most of civil engg is not intersted to going for teaching field?

2061


how much cement and sand required for 100sqm of wall plastering in different proportions

2384


What is Heavy Concrete & Normal Concrete

2773


Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??

2232


Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire

1612


what is the relation between pitch of steel and depth of slab?

3393


How many square meter can mason layout chb per hour

2250


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

2612


how u design STAGING for Superstructure in BRIDGE construction?

2363