what is the compresive strength of m20 concrete at 7 day
Answer Posted / prabin j
it should be 67% in 7 days. 13.4 N/mm2
| Is This Answer Correct ? | 18 Yes | 4 No |
Post New Answer View All Answers
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
How much cement will require for 1Rmt Skirting laying
which type of instrument included in plumbing work?name of instrument?
why we use 19x9x9and 20x10x10 but not other
how to calculate mivan shuttering matrial
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
What are the problems one might face while having a Cantilever balcony?
What is the per cu. mt. price of ready mix in Gujarat region.?
Define What is unit weight of normal concrete?
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
what is meant by residual strain?
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
Volume of 25kg putty bag & 40 kg putty bag volume??
How do you calculate the unit weight of concrete?