Answer Posted / praksh
Lap Length=48 x D (where d= dia of rod.a)
Ex-10 mm Dia rod=48 x 10 = 480 mm length
| Is This Answer Correct ? | 47 Yes | 5 No |
Post New Answer View All Answers
Explain what is the difference between built area and super built up area?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
what is the list of building construction equipment & teir output?
how to disign cuplock shuttering and it's matireal requirement snd any related web site
cement and sand required for one block of size 0.23*0.15*0.46
what is pqc
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
What is the use of extend command?
What is the use of water table & Kreb stone for drain
Whats the meanig of ,'K' VALUE in the case of soil.....
is concealed wiring a problem in fly ash brick wall?
what is idealized curve for concrere and steel
Which code is used for tor & tmt steel bar?
what is meant by residual strain?
What happens to Load at yielding ?