How calculate the material in concrete mix in ratio 1:2:4 ?
Answer Posted / shaikh moyunuddin
to calculate ratio 1:2:4
we consider 1 cu.m. ratio 1:2:4
total quantity=1+2+4=7
for cement=1*15.2/7=2.17cu.m.
for bag=2.17/0.35=6.20 bag
for sand=2.17*2=4.34cu.m.
for aggregate=2.17*4=8.68cu.m.
| Is This Answer Correct ? | 19 Yes | 14 No |
Post New Answer View All Answers
What is braced excavation all about?
What is aggregate?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
All aptitude question of Bechtel
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
How is make concrete cube?
How did the romans get water up hills using aqua ducts?
What is the meaning of soil reinforcement?
How much of the strength of concrete comes from post- production curing?
What is factor not to be taken in consideration in mix design?
what is the difference between tsp & tower
what will be price of 1:2:4pcc per kg?
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)