How calculate the material in concrete mix in ratio 1:2:4 ?
Answer Posted / shaikh moyunuddin
to calculate ratio 1:2:4
we consider 1 cu.m. ratio 1:2:4
total quantity=1+2+4=7
for cement=1*15.2/7=2.17cu.m.
for bag=2.17/0.35=6.20 bag
for sand=2.17*2=4.34cu.m.
for aggregate=2.17*4=8.68cu.m.
Is This Answer Correct ? | 19 Yes | 14 No |
Post New Answer View All Answers
How many square meter can a worker/labor demolish a structure per day?
how much of the strength comes from post-production curing
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
what is modular brick and it size
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
what is the water-cement ratio of mix design while 30mpa in 7 days?
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
What should be the standard roof height like to be?
What will be weight of 0.5mm GI sheet per sq.ft?
what is anchorage length,lap length and (dont remember the last one)
List out some of the software program that can be useful for architect?
How are freeway bridges built?
How do you calculate load bearing capacity of a waffle slab?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
How can explode a block?