how we can prevent freshly laid concrete from rain ,, What
the plastering thickness for a) inner brickwork b) outer
brickwork c) beams & slabs

Answer Posted / rohidas patil

to cover the tharpalene over the freshly laid concrete
to prevent the concrete from rain.
2)for internal 12mm thick
3) for external 20mm thick for 2 layers ( 12mm +8 mm)
4) for ceilling 8mm

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How good are the Weinerberger Porotherm bricks that are being used in construction in Chennai, India. Its being used in non load bearing walls and has a compressive strength greater that 35 kg/cm^2 and a density of approx.694 - 783 kg/m3.

2151


In csae of hume pipes NP stands for Non Pressure bur what does it really mean?

1808


What is the ideal size of the living room ranges from small to large size?

649


Define polar co ordinates.

694


How to calculate woden area in sft and Cft

1096






quantity of material needed for rubble stone masonry for 1:4 and 1:6

1214


At what point does a circle start losing area when being flattened?

624


How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm

1001


Concrete cover for slab, column, beam and footing?

634


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1270


How many days should curing of plastering, brick work and concrete

1200


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

1877


What is Refuse Area In High Rise Building ?

1487


satart to end steps by step process of building construction...? i want to planning theme accuretly

1439


what are the proper pipes for salt water line

1848